VICTORIA BRIDGE

This multi-award winning project involved significant repairs and maintenance to a listed bridge.

It was only made possible because of the spanning capability of the Technitruss platform which spanned 36m, carrying 12 Tonnes of scaffolding with a safe working load of 4 Tonnes.

The space frame was floated into position on a pontoon.